September, 2018

  • Signed new subconsultant contract with Kittelson Associates, Inc for the East Portland Access to Employment and Education Project for PBOT.

  • Successfully made the transition and upgrade to Google G-Suite series. File sharing capacity is now  5 TB.

August, 2018
  • Successfully acquired service provider letters for CWS and Water District for Washington County project for office addition

  • Submitted draft TPAR sheets for review

  • Submitted for and was awarded a permit for the garage foundation repair project of a Portland resident

 
July, 2018
  • Flanders kick-off

  • Submitted Traffic Control Plans for Marion County’s Traffic Signal Interconnect Project.

  • Started a new multiphase home renovation and new shop project in Camas, WA

  • Provided structural review of Martindale Carport and provided a stamped updated set of calculations for review

June, 2018
  • ·Started a new project in Washington County for an office addition, including parking and associated water treatment and flow-control.

May, 2018
  • Delivered base plans for Marion County’s Traffic Signal Interconnect plans

April, 2018
  • Received training and have became ODOT certified in the Design of ADA Curb Ramps and Pedestrian Signal replacements, including TPAR's (Temporary Pedestrian Access Routes)

  • Attended the 2018 Oregon APWA Spring Chapter, won a wonderful gift basket, and met some great people along with seeing some regulars of the industry

  • Received Notice to Proceed and performed a site visit for a garage foundation repair project of a Portland resident at which time the Client requested a return visit to look at other potential issues and assessment

 
March, 2018
  • Final Front Ave-Naito Pkwy LID Project Mylar Plans signed for PBOT

  • Developing the ability to take efficient high definition VR images for design and construction

  • Delivered final signed plans to Marion County for the Wintercreek Road Reconstruction Project

  • Residential side sewer permit application to Piece County for a University Place, WA accepted and client requested to refer us to others.

  • Submitted plans to Yamhill County for a residential spiral staircase installation

 
February, 2018
  • Submitted 95% Front Ave-Naito Pkwy LID Project PS&E with Kittelson to PBOT

  • Delivered 75% plans to Marion County for the Wintercreek Road Reconstruction Project

  • Submitted residential side sewer permit application to Piece County for a University Place, WA client looking to convert from gravity to FM

  • Submitted plans and stormwater reports for the boundary lot adjustment and development review application of the of the Bosich Chung Apartments development proposed in Tacoma, WA

January, 2018
  • Submitted 60% Front Ave-Naito Pkwy LID Project PS&E with Kittelson to PBOT

  • Successfully made the transition and migration over to Google Drive from Microsoft Onedrive. File sharing and collaboration is much better now!

  • Met with Independence, OR PW director to discuss draft report of TIA scope project and add data collection as an additional item of the contract

  • Finished and delivered drafting of both the Silverton and Cordon Leg design markups to Marion County for the TSI project

December, 2017
  • Delivered project staking notes to Marion County for the Wintercreek Road Reconstruction project

  • Picked up orphaned University Place, WA side sewer project

  • Finished and delivered drafting of both the Lancaster and Silverton Leg design markups to Marion County for the TSI project

November, 2017
  • Submitted 30% Front Ave-Naito Pkwy LID Project PS&E with Kittelson to PBOT

  • Delivered draft TIA scope report to Independence, OR

October, 2017
  • Met with Sheridan and ODFW on site in regards to a potential dock improvements to one of their fishing ponds to encourage more recreational activities in and around the City 

September, 2017
  • Signed and delivered survey maps for a retail shop building in Portland, OR

  • Assisted Beyler Consulting in completing and delivering civil plan sets to several cities in Washington

August, 2017
  • Delivered plans to owner and contractor for patio renovation in Camas, WA

  • Received notice to proceed for our first subdivision project in Dayton, OR

  • City of Sheridan approved set of plans for ADA improvements

  • Signed and delivered survey maps for a manufacturing building in Tualatin, OR

  • Submitted 30% paving and erosion control plans to the City of Portland for a low impact design road project  

  • Delivered plans for ADA improvements to the City of Sheridan for a manufacturing building

  • Submitted civil set of plans to University Place, WA for Creek Corner Development project

June, 2017
  • Delivered civil set of plans to the City Of Tacoma, WA for coffee shop project

April, 2017
  • Delivered set of plans to Marion County which involved full vertical and horizontal design of approximately 3 miles of roadway, including typical sections and sections, as well as retaining wall designs, intersection layouts, grading, and sight distance checks for a full-depth reclamation project
February, 2017
  • Delivered base map for Marion County's traffic signal interconnect project

 
January, 2017
  • Received notice to proceed for Marion County's full depth reclamation project
December, 2016
  • Received notice to proceed for creating base map for Marion County's traffic signal interconnect project